Grand opening of Myra Canyon Trestles was held on July 6, 2008.
136.76 Frame trestle #18 55x10
137.16 Frame trestle #17 27x8
137.22 Frame trestle #16 27x12
137.27 Frame trestle #15 46x12
137.48 Frame trestle #14 73x12
137.73 Frame trestle #13 87x15
137.81 Frame trestle #12 24x10
137.96 Tunnel. 114
138.22 Frame trestle #11 132x24 This is the summit of the Carmi Subdivision at 1274 metres.
138.91 Tunnel. 84
139.03 Frame trestle #10 59x9
139.28 Klo Creek—East Fork Canyon Creek Bridge #9 111x48 This was originally a frame trestle, changed when CPR upgraded the line. The present bridge consists of five steel through-plate girder spans on steel towers. (The wooden deck was burnt off in the fire)
139.42 Frame trestle #8 73x21
139.80 Water tower The concrete foundation blocks are still here.
140.81 S-Curve frame trestle #7. 90x25
141.50 Pooley Creek—West Fork Canyon Creek Bridge #6 220x55 This is the longest and highest bridge in Myra Canyon. Originally a frame trestle, it was replaced in 1931-32 with steel. The bridge consists of twelve steel through-plate girder spans on steel towers. (The wooden deck was burnt off in the fire)
141.74 Frame trestle #5 23x3
141.89 Frame trestle #4 150x37
142.40 Frame trestle #3 82x9
142.6 The KVR was relocated, diverting a 142 metre-long trestle. Sections of the original trestle are still standing and the original grade is passable and worth exploring. (Condition of this trestle is unknown since the fire.)
144.0 Frame trestle #2 110x15
145.5 Frame trestle #1. 78x15
145.6 End of Myra Canyon
146.5 Ruth Station
155.7 Water Tower
157.5 Lorna Station
170.3 Chute Lake Wye
171.4 Chute Lake Station
Directions:
Many access points:
- above (Nouth) Naramata past Naramata Lake
- Above Kelowna (South) up Chute Lake Road or June Springs Road
- Above hiway 33 South on Gallagher Road and up a myiad of Forestry Roads.
Instructions:
(a) Click above link to get placed in edit mode with existing (form)
(b) When finished, your update is available to view as draft (see wiki update pending link below stats on trail page)
(c) editors are notified and must approve all edits before they go live